over

13,350 customers

We have successfully supplied talior-made boiler
solutions for over 13,350 companies
bag
bag
bag
bag

Our service makes your boiler operate more economically

If you run into any problems with the boiler, please contact us or fill out the online service request. We will do our best to resolve any problems you might have within 24 hours.

Rescent Posts

Check Out The Best Offer To Stay Trend

FAQ & Brands

Check Out The Best Offer To Stay Trend
After the coil water pressure test, the residual water is removed through special tooling, so that the user's "boiler" time after installation is shortened from 12 days to two days, saving about 30,000 yuan in boiler cost.
Six domestic advanced fully automated production lines of convection tubes, coil tubes, threaded tubes, membrane walls, serpentine tubes, and headers ensure that the processed boiler components are all uniform in size. Easy assembly between components, no mandatory assembly, and boiler life extended by more than 10 years.
Material re-inspection at the factory, displacement of material inspection number, welding test plate, heat treatment, pre-expansion before welding, flaw detection inspection, hydraulic test Seven process stop points are set up and each is controlled by seven different responsible divisions. If any one fails, no one can proceed to the next process.
Large areas of automation, digital equipment, adequate semi-finished product preparation, and good supplier relations have greatly shortened the supply cycle, and all quick-installed boilers can be delivered within 30 days.